ตัวกรองผลการค้นหา
คลิกที่แต่ละคำเพื่อดูรายละเอียด
(english) Firing a mold at a high temperature to remove pattern material residue.
(Concrete Engineering) The addition of water to the cement mix whether at the batch plant, during transit or at the jobsite to achieve the specified water to cement ratio.
(Software Engineering) the activity that lays out a timeline for work to be conducted on a project
(Environmental Engineering) The depth at which an inflection point occurs in a lake temperature profile.
(Environmental Engineering) An organic compound with a carbonyl at one end of a hydrocarbon group.
(english) A three-roll cluster used to control line tension at strategic locations on the line.
(english) In hypereutectoid steel, the temperature at which cementite goes into complete solution with austenite.
(english) Machine located at each delivery reel to automatically place circumference bands around completed coils.
(english) 1) Roll used as a support roll mainly for plater rolls. 2) Two rolls, one on top and one on bottom of the two work rolls which apply pressure and reduce the flexing of the work rolls.
(Software Engineering) a point at which manager or the customer decides whether the project should proceed
(english) In hypoeutectoid steel, the temperature at which transformation of ferrite into austenite is completed upon heating.