ตัวกรองผลการค้นหา
คลิกที่แต่ละคำเพื่อดูรายละเอียด
(Concrete Engineering) To alter composition or physical state by heating to a specific temperature for a specific length of time.
(english) A long, tapered cutting tool with serrations which,when forced through a hole or across a surface, cuts a desired shape or size.
(Environmental Engineering) The act of preparing a landfill for long term inactivity, including placement of a cover over the landfill to prevent infiltration of surface water.
(english) Octagon-shaped wooden stick approximately 5' long. This stick is used in the baller area, to change burr mashers, to start a coil with a large ID, etc.
(english) A core which has been heated through sufficient time and temperature to produce the desired physical properties attainable from its oxidizing or thermal-setting binders.
รอยต่อก่อสร้าง : รอยต่อที่กำหนดไว้ในงานคอนกรีตใน 1 วัน ใช้กับอาคารขนาดใหญ่ ซึ่งต้องเทคอนกรีตจำนวนมากติดต่อกัน และระยะเวลาที่ใช้ในการเทคอนกรีตนั้นเกินกว่าระยะเวลาการแข็งตัวของคอนกรีต (initial setting time)
(english) A structure in wire or sheet in which the boundaries of the grains tend to be aligned normal to the long axis and to extend completely through the thickness.
(Software Engineering) a measure of the degree to which software operates reliably over some period of time ความเชื่อถือได้, ความไว้ใจได้ [วิศวกรรรมอุตสาหการ]; ความเชื่อถือได้ [อิเล็กทรอนิกส์, ไฟฟ้ากำลัง]
(english) A relatively long straight, rigid piece pf metal; long steel products rolled from billets into such shapes as squares,rectangles, rounds,angles,channels,hexagons,and tees. In steel, “merchant bars” include rounds,flats,angles,squares,and channels that are used by fabricators to manufacture a wide variety of products such as furniture,stair railings and farm equipment. Concrete reinforcing bar (rebar) is used to strengthen concrete in highways,bridges and buildings.
(Environmental Engineering) Semi-aquatic land, that is land that is either inundated or saturated by water for varying periods of time during each year, and that supports aquatic vegetation which is specifically adapted for saturated soil conditions.
(Environmental Engineering) The amount of oxygen required to oxidize any organic matter present in a water during a specified period of time, usually 5 days. It is an indirect measure of the amount of organic matter present in a water.
(Concrete Engineering) Delayed vibration of concrete that has already been placed and consolidated. Most effective when done at the latest time a running vibrator will sink of its own weight into the concrete and make it plastic and workable again.