ตัวกรองผลการค้นหา
คลิกที่แต่ละคำเพื่อดูรายละเอียด
(english) Joining two edges or ends by placing one against the other and welding them.
(Concrete Engineering) The volume of an ingredient in its solid state, without voids between individual pieces or particles, in the case of fluids, the cubic content occupied. In concrete, the actual volume occupied by the different ingredients determined by dividing the weight of each ingredient pounds, by ifs specific gravity, times the weight of one cubic foot of water in pounds. Example: Absolute Volume of one sack of cement equals: 94 ๗ (3.15X62.4) = 0.478 cubic feet
(english) Flexibility is the inverse of stiffness. When a force is applied to a structure, there is a displacement in the direction of the force; flexibility is the ratio of the displacement divided by the force. High flexibility means that a small load produces a large displacement.
(english) Reversing the wrap of a coil putting the top surface on the bottom.
(Concrete Engineering) Aggregate whose largest particle size is present in sufficient quantity to affect the physical properties of concrete; generally designated by the sieve size on which the maximum amount permitted to be retained is 5 or 10 percent by weight.
Removal of part of coil from entry end of unit; may be necessitated by a defect in coil or by a wreck in the mill, etc. Backoff weight is the part of the coil that is removed and not finished/produced.
(Software Engineering) the activity that creates the Project Plan
(Software Engineering) a technique that translates the needs of a customer in technical requirements for software by assessing the value of each requirement
การตรวจสอบโดยวิธีใช้เครื่องมือเฉพาะ
ความล่าช้าของงานที่เกิดจากหน่วยงานที่มีหน้าที่
พายัพภาคอุดร
(english) The stationary half-die.