ค้นเจอ 54 รายการ

คำศัพท์ช่างภาษาอังกฤษ - ไทยที่เกี่ยวข้องกับ "weight against"

คลิกที่แต่ละคำเพื่อดูรายละเอียด

Water-Cement Ratio

(Concrete Engineering) The ratio of the amount of water, exclusive of that absorbed by the aggregates, to the amount of cement in a concrete mix. Typically expressed as percentage of water, by weight in pounds, to the total weight of portland cement, fly ash, and any other cementitious material, per cubic yard, exclusive of any aggregates.

Cold Joint

(Concrete Engineering) A visible lineation which forms when the placement of concrete is delayed. The concrete in place hardens prior to the next placement of concrete against it.

Magnetite

(Concrete Engineering) An aggregate used in heavy weight concrete, consisting primarily of ferrous metaferrite (Fe304). A black magnetic iron ore with a specific gravity of approximately 5.2 and a Mohs hardness of about 6.

Blast Cleaning (blasting)

(english) A process for cleaning or finishing metal objects by use of an air jet or centrifugal wheel that propels abrasive particles (grit, sand, or shot) against the surfaces of the workpiece at high velocity.

Absolute Volume

(Concrete Engineering) The volume of an ingredient in its solid state, without voids between individual pieces or particles, in the case of fluids, the cubic content occupied. In concrete, the actual volume occupied by the different ingredients determined by dividing the weight of each ingredient pounds, by ifs specific gravity, times the weight of one cubic foot of water in pounds. Example: Absolute Volume of one sack of cement equals: 94 ๗ (3.15X62.4) = 0.478 cubic feet

Revibration

(Concrete Engineering) Delayed vibration of concrete that has already been placed and consolidated. Most effective when done at the latest time a running vibrator will sink of its own weight into the concrete and make it plastic and workable again.

Maximum Size Aggregate

(Concrete Engineering) Aggregate whose largest particle size is present in sufficient quantity to affect the physical properties of concrete; generally designated by the sieve size on which the maximum amount permitted to be retained is 5 or 10 percent by weight.

Backoff

Removal of part of coil from entry end of unit; may be necessitated by a defect in coil or by a wreck in the mill, etc. Backoff weight is the part of the coil that is removed and not finished/produced.

Blow Back

(english) A coating defect consisting of a lower coating film weight on the bottom of the coated sheet caused by high velocity air in the oven. Blow back usually occurs with high solids coatings which have little solvent to evaporate and "set" the film.

GFRC - Glass Fiber Reinforced Concrete

(Concrete Engineering) Concrete panels, usually architectural designs, reinforced with a high zirconia (16% minimum), alkali-resistant glass fiber. Optimum glass fiber content of 5% by weight. Lower fiber content results in lower early ultimate strengths, higher fiber content can produce composite compaction and consolidation difficulties.

Base Box

(english) Unit of area of 112 sheets of tin mil products (tin plate, tin free steel or black plate) 14 by 20 inches, or 31,360 square inches. Tin Plate is sold, and carried in finished inventory, on a weight per unit area rather than on a thickness basis.

Blasting (Blast Cleaning)

(english) A process for cleaning or finishing metal objects by use of an air blast or centrifugal wheel that throws abrasive particles against the surface of the work pieces. Small, irregular particles of steel or iron are used as the abrasive in grit blasting, and steel or iron balls in shot blasting.


 ศัพท์ช่างภาษาอังกฤษ – ไทย จัดกลุ่มตามตัวอักษร A-Z