ค้นเจอ 571 รายการ

คำศัพท์ช่างภาษาอังกฤษ - ไทยที่เกี่ยวข้องกับ "into the bargain"

คลิกที่แต่ละคำเพื่อดูรายละเอียด

Climatology

(Environmental Engineering) The study of the climate, how the earth's atmosphere performs over long periods of time.

Base

(english) The steel or concrete pedestal on which the coils are stacked during the batch annealing process.

Inertial Force:

(english) A fictitious force used for convenience in visualizing the effects of forces on bodies in motion. For an accelerating body, the inertial force is considered as a body force whose resultant acts at the object's center of gravity in a direction opposite the acceleration. The magnitude of the force is the mass of the object times the magnitude of the acceleration.

Rotation:

(english) Motion of an object where the path of every point is a circle or circular arc. A rotation is defined by a point and vector which determine the axis of rotation. The direction of the vector is the direction of the axis and the magnitude of the vector is the angle of rotation.

Chair(s)

(Concrete Engineering) In concrete formwork, the support for the reinforcing steel.

Defect amplification

(Software Engineering) when a defect is introduced early in the software process and remains undetected, it often is amplified into multiple defects later in the software process

Base Metal

(english) (1) The metal present in the largest proportion in an alloy; (2) the metal to be brazed, cut or welded; (3) after welding the part of the metal that was not melted during the process.

Secondary treatment

(Environmental Engineering) In wastewater treatment, the conversion of the suspended, colloidal and dissolved organics remaining after primary treatment into a microbial mass with is then removed in a second sedimentation process. Secondary treatment included both the biological process and the associated sedimentation process.

Paradigms

(Software Engineering) the process model

Basic Oxygen Furnace (BOF)

(english) "WHAT A pear-shaped furnace, lined with refractory bricks, that refines molten iron from the blast furnace and scrap into steel. Up to 30% of the charge into the BOF can be scrap, with hot metal accounting for the rest. WHY BOFs, which can refine a heat (batch) of steel in less than 45 minutes, replaced open-hearth furnaces in the 1950s; the latter required five to six hours to process the metal. The BOF's rapid operation, lower cost and ease of control give it a distinct advantage over previous methods. HOW Scrap is dumped into the furnace vessel, followed by the hot metal from the blast furnace. A lance is lowered from above, through which blows a high-pressure stream of oxygen to cause chemical reactions that separate impurities as fumes or slag. Once refined, the liquid steel and slag are poured into separate containers. "

Big Winch

(english) The tool used to spot (or position) the rail cars for unloading. It is located on the north end of the unloading area.

Breakout

(english) An accident caused by the failure of the walls of the hearth of the furnace resulting in liquid iron or slag (or both) flowing uncontrolled out of the blast furnace.


 ศัพท์ช่างภาษาอังกฤษ – ไทย จัดกลุ่มตามตัวอักษร A-Z