ตัวกรองผลการค้นหา
คลิกที่แต่ละคำเพื่อดูรายละเอียด
(Concrete Engineering) The shortening of a member in pre-stressed concrete which occurs on the application of forces induced by prestressing.
(Software Engineering) a white box test case design technique that used the algorithmic flow of the program to design tests
(english) A vessel, normally cylindrical, which is used to store fluid and gas for future release of the energy in the compressed fluid and gas. Normally contains a diaphragm or piston between the fluid (liquid) and gas chambers. Fluid is normally introduced at one end and the gas at the opposite end.
(Concrete Engineering) The plane along which a structure under stress will tend to fracture; may exist because of the nature of the structure and its loading, by accident, or by design.
(Environmental Engineering) Organisms which utilize energy from wastes or dead organisms. Decomposers complete the cycle by returning nutrients to the soil or water and carbon dioxide to the air or water.
(Concrete Engineering) A method of prestressing reinforced concrete in which the steel is stressed before the concrete has hardened and restrained from gaining its unstressed position by bond to the concrete.
(english) The standard steel pipe used in plumbing. Heated skelp is passed continuously through welding rolls, which form the tube and squeeze the hot edges together to make a solid weld.
(Environmental Engineering) In wastewater treatment, the conversion of the suspended, colloidal and dissolved organics remaining after primary treatment into a microbial mass with is then removed in a second sedimentation process. Secondary treatment included both the biological process and the associated sedimentation process.
(Concrete Engineering) The volume of an ingredient in its solid state, without voids between individual pieces or particles, in the case of fluids, the cubic content occupied. In concrete, the actual volume occupied by the different ingredients determined by dividing the weight of each ingredient pounds, by ifs specific gravity, times the weight of one cubic foot of water in pounds. Example: Absolute Volume of one sack of cement equals: 94 ๗ (3.15X62.4) = 0.478 cubic feet
ทำให้ประกันภัยมีผลบังคับใช้และรักษาสภาพประกันภัย
ด้วยค่าใช้จ่ายของผู้รับจ้างเอง
ต้นทุนงานก่อสร้าง