ตัวกรองผลการค้นหา
คลิกที่แต่ละคำเพื่อดูรายละเอียด
(english) In hypereutectoid steel, the temperature at which cementite goes into complete solution with austenite.
(Software Engineering) a set of activities conducted with the intent of finding errors in software
(english) The part of the extrusion press into which the billet to be extruded is placed.
(english) A cavity which was produced during the solidification of metal by evolved gas, which in failing to escape is held in pockets.
(Concrete Engineering) A non-metallic waste product developed in the manufacture of pig iron, consisting basically of a mixture of lime, silica and alumina, the same oxides that make up portland cement, but not in the same proportions or forms. It is used both in the manufacture of portland blast furnace slag cement and as an aggregate for lightweight concrete.
(english) Uncoiler rolls through which the strip passes; composed of a mandrel and leveling rolls which unwind the strip prior to processing through the Pickler. Breaker rolls assist in breaking up the Hot Mill surface scale.
(english) The residual portion of an extrusion billet that is not forced through the die at the end of the extrusion cycle.
(english) 1) Usually refers to the entry end of process lines. 2) The outside lap 2) of the produced coil, or the inside lap of the consumed coil.
(Concrete Engineering) A round, straight steel rod, 5/8' in diameter and approximately 24' in length, having the tamping end rounded into a hemispherical tip, the diameter of which is 5/8'.
(Software Engineering) a technique that translates the needs of a customer in technical requirements for software by assessing the value of each requirement
(english) Line equipment used in the Tin Mill for starting coils on prime or reject reels. The belt wrapper ensures a proper start.
Removal of part of coil from entry end of unit; may be necessitated by a defect in coil or by a wreck in the mill, etc. Backoff weight is the part of the coil that is removed and not finished/produced.