ตัวกรองผลการค้นหา
คลิกที่แต่ละคำเพื่อดูรายละเอียด
(Software Engineering) techniques for process improvement that are based on measurements of the product and the process
(Software Engineering) a project planning activity that attempts to project effort and cost for a software project
(Environmental Engineering) A U.S. EPA hazardous waste characteristic defined with a rigorous test procedure, the TCLP (for Toxicity Characteristic Leaching Procedure). In the procedure, a waste is extracted for 24 hours with an acetic acid solution. The acid extract is then analyzed for the presence of any of the contaminants listed in the procedure.
(Environmental Engineering) Semi-aquatic land, that is land that is either inundated or saturated by water for varying periods of time during each year, and that supports aquatic vegetation which is specifically adapted for saturated soil conditions.
การชำระเงินค่าอุปกรณ์และวัสดุในกรณีการสั่งหยุดงานชั่วคราว
การชำระเงินค่าโรงงานและวัสดุอุปกรณ์ในกรณีการสั่งหยุดงานชั่วคราว
(Software Engineering) an indication of the overall effort to be expended or the number of people working on the project
(english) The resultant of a system of forces causing rotation without translation. A moment can be expressed as a couple.
(Environmental Engineering) The processes which sustain an organism, including energy production, synthesis of proteins for repair and replication.
An informal measure of the ease with which a user interface can be learned and applied with efficiency and without errors
(english) The proportional constant between stress and strain for material with linear elastic behavior: calculated as stress divided by strain. Modulus of elasticity can be interpreted as the slope of the stress-strain graph. It is usually denoted as E, sometimes known as Young's Modulus Y, or E-Modulus.
(Concrete Engineering) Energetic agitation of concrete to assist in its consolidation, produced by mechanical oscillating devices at moderately high frequencies. (A.) External vibration employs a device attached to the forms and is particularly applicable to the manufacture of precast items and for the vibration of tunnel lining forms. (B.) Internal vibration employs an element which can be inserted into the concrete; and is more generally used for cast-in-place construction.