ค้นเจอ 120 รายการ

Adeline Steelmaking Process

แปลว่า(english) Method of producing a precision casting of steel or steel alloys using aluminolthermic process and lost wax, followed by centrifugal action.

Column Anaogy Method

แปลว่าวิธีเสาอุปมาน

Cure

แปลว่า(Concrete Engineering) Method of maintaining sufficient internal humidity and proper temperature for freshly placed concrete to assure proper hydration of the cement, and proper hardening of the concrete.

Brinell Hardness Testing

แปลว่า(english) Method of determining the hardness of materials; involves impressing a hardened ball of specified diameter into the material surface at a known pressure (10-mm ball, 500-kg load for aluminum alloys). The Brinell hardness number results from calculations involving the load and the spherical area of the ball impression. Direct-reading testing are generally used for routine inspection of forgings, and as a heat treat control function.

Agile development (also referred to as agile process model)

แปลว่า(Software Engineering) an adapted version of software engineering that emphasizes customer communication, incremental software delivery, informal methods and work products, and highly motivated teams.

Matrix Method

แปลว่าวิธีเมทริกซ์

moment area method

แปลว่าวิธีพื้นที่โมเมนต์

Energy Method

แปลว่าวิธีพลังงาน

Cause-effect graphing

แปลว่า(Software Engineering) a black-box testing method

Break Test (for tempered steel)

แปลว่า(english) A method of testing hardened and tempered high carbon spring steel strip wherein the specimen is held and bent across the grain in a vice-like calibrated testing machine. Pressure is applied until the metal fractures at which point a reading is taken and compared with a standard chart of brake limitations for various thickness ranges.

FAST

แปลว่า(Software Engineering) Facilitated application specification techniques, a structured meeting between developer and customer; intent is to define basic requirementsFormal methods

Tilt-up

แปลว่า(Concrete Engineering) A method of concrete construction such as where members are cast horizontally near their eventual position, usually on a recently placed slab, and then tilted into place after removal of forms.