Z-Mill

แปลว่า(english) The full name for z-mill is Sendzimir mill. A Z-mill operates with a very small diameter work roll, normally about 2 inches, backed up by a number of rolls in a pyramid-shaped stack. This roll set up allows you to exert extremely high forces through the work roll and yet keep the work roll from extreme flexing. The take-up roll on the Z-Mill also exerts a tension on the coil as it comes through the mill. The combination of high pressure and tension makes the mill capable of rolling material thin and flat.

Operation and Maintenance Plan

แปลว่าแผนปฏิบัติงานและบำรุงรักษา

Interoperability

แปลว่า(Software Engineering) the degree to which one application communicates or interfaces with another

Security

แปลว่า(Software Engineering) the ability of software to operate in a manner that is secure from internal or external attack

Operating Overhead Costs

แปลว่าต้นทุนดำเนินการ

Burr 2

แปลว่า(english) Roughness left by a cutting operation such as slitting, shearing, blanking , etc.

Brake Press Bending

แปลว่า(english) An operation which produces various degree bends when fabricating parts from steel.

hand operator

แปลว่าการปรับแต่งด้วยมือ, ที่ปรับแต่งด้วยมือ เช่น ที่ปรับนมหนูในคาบูเรเตอร์ด้วยมือ

Burr

แปลว่า(english) The very subtle ridge on the edge of strip steel left by cutting operations such as slitting, trimming, shearing, or blanking. For example, as a steel processor trims the sides of the sheet steel parallel or cuts a sheet of steel into strips, its edges will bend with the direction of the cut.

Claims Cooperation Clause

แปลว่าเงื่อนไขที่ต้องแจ้งความคืบหน้าให้ผู้รับประกันภัยทราบเป็นระยะหากมีความเสียหายเกิดขึ้น

Operation and Maintenance Supervisor

แปลว่าผู้ควบคุมการปฏิบัติงานและบำรุงรักษา

Basic Oxygen Furnace (BOF)

แปลว่า(english) "WHAT A pear-shaped furnace, lined with refractory bricks, that refines molten iron from the blast furnace and scrap into steel. Up to 30% of the charge into the BOF can be scrap, with hot metal accounting for the rest. WHY BOFs, which can refine a heat (batch) of steel in less than 45 minutes, replaced open-hearth furnaces in the 1950s; the latter required five to six hours to process the metal. The BOF's rapid operation, lower cost and ease of control give it a distinct advantage over previous methods. HOW Scrap is dumped into the furnace vessel, followed by the hot metal from the blast furnace. A lance is lowered from above, through which blows a high-pressure stream of oxygen to cause chemical reactions that separate impurities as fumes or slag. Once refined, the liquid steel and slag are poured into separate containers. "

 ศัพท์ช่างภาษาอังกฤษ – ไทย จัดกลุ่มตามตัวอักษร A-Z