ตัวกรองผลการค้นหา
คลิกที่แต่ละคำเพื่อดูรายละเอียด
(english) Tin Mill term; Thickness divided by .00011. Also weight in pounds of one Base Box of Tin plate. In finished inventory base weight is specified instead of decimal thickness.
(Concrete Engineering) Moisture which is mechanically held in a material. In aggregates, that water which is not available to become part of the mixing water is designated "absorbed" water.
(english) A defect in metal, on or near the surface, resulting from the expansion of gas in a subsurface zone. Very small blisters are called pinheads or pepper blisters.
(Environmental Engineering) A reactor in which the microorganisms are suspended in the wastewater. Examples of suspended growth reactors are activated sludge reactors and anaerobic digesters. See attached growth reactor.
(Software Engineering) a potential problem or occurrence that put a project in jeopardy ความเสี่ยง
(Environmental Engineering) A bond in which electrons are shared approximately equally by two atoms.
(Environmental Engineering) A reaction in which the rate expression corresponds to the stoichiometric equation.
วิธีการอนุญาโตตุลาการ ในการตัดสินข้อเรียกร้องหรือข้อพิพาท โดยฝ่ายหนึ่งไม่ได้มาร่วมอยู่ด้วย
(Concrete Engineering) The colloidal gel (glue like) material that makes up the major portion of the porous mass of which hydrated cement paste is composed.
(Concrete Engineering) An addition for hydraulic cement, or an admixture for concrete or mortar which entrains air in the form of minute bubbles in the concrete or mortar during mixing.
(english) A structure in wire or sheet in which the boundaries of the grains tend to be aligned normal to the long axis and to extend completely through the thickness.
(Concrete Engineering) The temporary force exerted by the jacking device which introduces tension into the tendons. Jacking Stress In prestress concrete, the maximum stress occurring in a tendon during stressing.