ตัวกรองผลการค้นหา
คลิกที่แต่ละคำเพื่อดูรายละเอียด
(english) Cylinders that supply the force used to hold the back-up rolls up in place.
(english) Devices used to remove build up on edge of strip after the slitting process.
(Environmental Engineering) The act of preparing a landfill for long term inactivity, including placement of a cover over the landfill to prevent infiltration of surface water.
(english) ZrO2 an acid refractory up to 2500 B0C (4532 B0F) having good thermal shock resistance and low electrical resistively.
(english) 1) Wooden separators which are used at both the bottom of a lift and between IPM's (bundles) of a lift. 2) The act of placing 4x4s between the lifts in the piler's box.
(Environmental Engineering) Treatment of a waste in place, as opposed to pumping or digging the waste up and then treating it.
(english) Small or large black spots that generally show up on surface and are generally caused by pickling steel too hot.
(english) Coils removed from the off-gauge reel. The BUST (build up side trimmer) coil contains defects (gauge variation and quality defects) and off-spec widths.
(Concrete Engineering) The colloidal gel (glue like) material that makes up the major portion of the porous mass of which hydrated cement paste is composed.
(english) A force considered to act along a single line in space. Concentrated forces are useful mathematical idealizations, but cannot be found in the real world, where all forces are either body forces acting over a volume or surface forces acting over an area.
(Environmental Engineering) The process of cleaning up a hazardous waste disposal site that has either been abandoned or that those responsible either refuse to cleanup or are financially unable to cleanup.
(english) Uncoiler rolls through which the strip passes; composed of a mandrel and leveling rolls which unwind the strip prior to processing through the Pickler. Breaker rolls assist in breaking up the Hot Mill surface scale.